CSCOM ecosystem
Trust center信任中心
Trust Centre · Governance信任中心 · 治理

The project team keeps their records.
Owners should keep their own.
项目团队会留下自己的记录。
业主也应拥有属于自己的项目历史。

CSCOM provides homeowners with independent project records, risk observation and key decision support — so important information stays clear and key decisions remain well-documented. CSCOM为业主提供独立的项目记录、风险跟踪和关键决策支持,让重要信息更清晰,让关键决定有据可查。

01 — Why01 — 为什么
Why owners need their own record为什么业主需要自己的项目记录
Information is scattered信息分散

Important information is spread across different emails, messages, folders and third-party systems.重要信息通常散落在不同邮箱、聊天记录、文件夹和第三方系统中。

Different roles, different records角色不同

No single role is naturally responsible for maintaining the homeowner's complete project history.没有一个角色天然负责维护业主完整的项目历史。

People change人员会变化

PMs, builders and consultants may change, but homeowners should not lose project continuity.PM、Builder和顾问可能更换,但业主不能因此失去项目的连续性。

CSCOM connects scattered information so homeowners can see what happened, why decisions were made, who is responsible for follow-up, and whether the history can be reconstructed.CSCOM把分散的信息连接起来,让业主能够看清项目发生了什么、为什么这样决定、相关事项由谁负责跟进,以及未来能否还原。

02 — Key moments02 — 关键节点
CSCOM helps at every stage在关键节点,CSCOM如何帮助业主
📋
Contract合同
Flag missing docs标记缺失文件
📁
Setup建档
Build record structure建立记录结构
💰
Payment付款
Organise materials整理付款材料
Variation变更
Record & track记录与跟踪
Issues问题
Flag open items标记未关闭事项
Completion交付
Final archive最终档案
Before signing the contract — confirm what documentation exists and flag missing items签署合同之前 — 确认已有哪些资料,标记缺失文件
When a progress claim is received — organise payment materials, related records and items still to be confirmed收到进度款申请时 — 整理已收到的付款材料、相关记录及仍待确认的事项
When a variation arises — record the source, related documents, quote basis and confirmation process出现Variation时 — 记录变更来源、相关文件、报价依据及确认过程
Builder makes a verbal promise — prompt written confirmation, record key commitmentsBuilder作出口头承诺时 — 提醒书面确认,记录关键承诺
Project is delayed — record delay timeline, notices, explanations and outstanding questions项目开始延期时 — 记录延期时间线、相关通知、各方说明及尚待确认的问题
Unresolved site issues — flag open items and prompt whether professional advice is needed现场问题长期未解决 — 标记未关闭事项,并提示是否需要进一步处理或寻求专业意见
PM or consultants change — preserve project continuity and prevent information lossPM或顾问更换时 — 保留项目连续性,避免信息丢失
Before practical completion — compile outstanding items, inspection results and project recordsPractical Completion及交付前 — 整理未完成事项、专业检查结果及相关项目记录
When professional advice is needed — help prepare questions and materials, connect appropriate support需要专业人士介入时 — 在所选服务范围内,协助准备问题和材料,并连接适合的专业支持

CSCOM is most valuable not after a project has gone wrong, but while it can still be clearly recorded and well-documented.CSCOM最有价值的时间,不是项目已经失控以后,而是在项目仍然可以被清楚记录和完整建档的时候。

03 — Who it's for03 — 适合谁
Different stages, different needs不同项目阶段,不同需求
First-time home builders第一次建房的私人业主

→ Know when to confirm, record and pay
→ Identify missing information
→ Know when professional advice is needed
→ 知道什么时候确认、记录和付款
→ 识别缺失信息和未解决事项
→ 知道什么时候需要专业意见

You don't need to become a construction expert — but you do need to know when to confirm, record and seek professional advice.您不需要成为建筑专家,但需要知道什么时候应当确认、记录和寻求专业意见。

Experienced or burned owners有经验或曾经吃过亏的业主

→ Records independent of builder, PM and consultants
→ Major items traceable with a timeline
→ Quickly reconstruct history if disputes arise
→ 独立于Builder、PM和顾问的完整记录
→ 重大事项可追溯、有时间线
→ 争议时能快速还原项目历史

Many homeowners suffer not because they had no professionals, but because they had no complete project history of their own.很多业主吃亏,不是因为没有专业人士,而是因为没有一套属于自己的完整项目历史。

Experienced owners and developers经验型业主及开发商

→ Reduce key person risk
→ Replicable, auditable, traceable governance
→ Unified management across projects
→ 降低Key Person Risk和人员依赖
→ 可复制、可审查、可追溯的治理系统
→ 跨项目统一管理和可见性

Move projects from relying on individual experience to relying on a replicable governance system.把项目从依赖个人经验,转变为依赖可复制的治理系统。

04 — What you get04 — 交付成果
What you actually receive购买后您实际获得什么
Independent Project Record

A unified project archive that belongs to the homeowner属于业主自己的统一项目档案

Project Timeline

A continuous timeline of key events, payments, variations, communications and decisions关键事件、付款、变更、沟通和决定的连续时间线

Open Items & Risk Register

Unresolved items, responsible parties, current status and issues requiring verification未关闭事项、相关责任方、当前状态和需进一步核实的问题

Decision Record

Major decisions, supporting evidence, related documents and confirmation process重大决定、依据、相关文件和确认过程

Key Stage Summary

Current status, missing information and next steps at key milestones关键节点的当前情况、缺失信息和下一步事项

Professional Escalation Pack

Where included in the selected service scope, help prepare questions and materials for lawyers, engineers, inspectors or other professionals在所选服务范围包含该项支持时,协助整理需要提交给律师、工程师、Inspector或其他专业人士的问题和材料

Final Project Archive

A retainable, searchable and traceable project history after completion项目完成后可保留、可查询、可追溯的项目历史

You are not buying a file system. You are buying an owner's record that helps you reconstruct facts, identify potential risk indicators and make well-informed decisions at critical moments.您购买的,不只是一个文件系统。而是一套在关键时刻帮助您还原事实、识别潜在风险信号并做出知情决策的业主记录。

Specific deliverables, update frequency and whether manual professional coordination is included depend on the service plan and formal service agreement.具体交付内容、更新频率及是否包含人工专业协调,取决于客户选择的服务方案及正式服务协议。

05 — Working together05 — 如何配合
CSCOM and the project managerCSCOM与项目经理如何配合
PM typically responsible forPM 通常负责
Drives delivery推动项目执行
→ schedule → budget → site → coordination→ 工期 → 预算 → 现场 → 协调
How does the project move forward?项目如何继续向前推进?
CSCOM primarily providesCSCOM 主要提供
Supports the owner's informed position帮助业主建立知情立场
→ records → risks → decisions → history→ 记录 → 风险 → 决策 → 历史
Does the owner know what happened and why?业主是否清楚发生了什么、为什么?

CSCOM is not a second PM and will not issue project instructions to builders or consultants. For projects requiring intensive daily management, we recommend homeowners engage a suitable PM. Clear responsibilities, records and decision trails also help protect diligent PMs and professional consultants.CSCOM不是第二个PM,也不会向Builder或顾问发出项目指令。对于需要深度日常管理的项目,我们会建议业主聘请合适的PM。清晰的职责、记录和决策轨迹,也有助于保护认真履职的PM和专业顾问。

06 — Independence06 — 独立性
Our independence我们的独立性

CSCOM's core services are paid for by the homeowner. Our project records, risk observations and item classifications should not change because of relationships with builders, suppliers, consultants or referral channels.CSCOM的核心服务由业主付费。我们的项目记录、风险观察和事项分类,不应因为Builder、供应商、顾问或渠道关系而改变。

CSCOM will not change the factual sources, item status or risk classifications in project records because a party is a partner, referrer or long-term service provider.CSCOM不会因为某一方是合作伙伴、推荐人或长期服务提供方,就改变项目记录中的事实来源、事项状态或风险分类。

If CSCOM has any referral, partnership, commission or other commercial arrangement with a third party, we will disclose it in accordance with applicable policies and take steps to manage potential conflicts of interest.如果CSCOM与任何第三方存在推荐、合作、佣金或其他商业安排,我们将按照适用政策进行披露,并采取措施管理潜在利益冲突。

Independence does not mean opposing the project team. It means that while working collaboratively, the homeowner always retains their own information, records and basis for judgement.独立不代表与项目团队对抗。它意味着在合作推进项目的同时,业主始终拥有属于自己的信息、记录和判断依据。

07 — Boundaries07 — 责任边界
Clear boundaries protect everyone清晰的边界,保护每一个项目参与方

CSCOM provides project records, process prompts, risk observations, decision support and professional coordination.CSCOM提供项目记录、流程提示、风险观察、决策支持和专业协调。

Unless separately agreed in writing, CSCOM does not assume day-to-day construction management or PM responsibilities, nor does it replace builders, architects, engineers, building surveyors, inspectors, quantity surveyors, lawyers or other regulated professionals.除非另有独立书面约定,CSCOM不承担项目日常施工管理或PM职责,也不会替代Builder、Architect、Engineer、Building Surveyor、Inspector、Quantity Surveyor、Lawyer或其他受监管专业人士。

CSCOM can help organise issues, identify matters that may warrant further professional review and prepare related documents. Final professional opinions are made by appropriately qualified and insured professionals. CSCOM does not guarantee project timelines, budgets, construction quality, builder performance or final outcomes.CSCOM可以协助整理问题、识别可能需要进一步专业审查的事项并准备相关文件。最终法律、工程、检查、认证、财务或其他专业意见,由具备相应资质和责任保险的专业人士作出。CSCOM不对项目工期、预算、施工质量、Builder履约或最终结果作出保证。

Specific service content, delivery standards, client responsibilities and limitations are governed by the formal service agreement between the client and CSCOM.具体服务内容、交付标准、客户责任、责任范围和限制,以客户与CSCOM签署的正式服务协议为准。

08 — Victoria role map08 — 维州工种边界
Construction roles and CSCOM's boundaries建设项目工种与CSCOM的职责边界

Residential construction projects involve many registered and unregistered roles. This map shows where CSCOM sits in relation to each — what we deliver directly, what we coordinate through qualified professionals, and what falls outside our scope entirely.住宅建设项目涉及多种注册和非注册工种。本图展示CSCOM与每个角色的关系——哪些由我们直接承担、哪些通过合格专业人员协调交付、哪些完全不在我们的职责范围内。

✓ CSCOM delivers✓ CSCOM直接承担
Owner-side Project Representation
Project Records & Governance Coordination
Documentation & Evidence Management
Contract Administration Support (Document & Process Only)
业主方项目代理
项目记录与治理协调
文件与证据管理
合同管理支持(仅限文件与流程)
↔ CSCOM coordinates↔ CSCOM协调交付
Architect · Building Designer
Structural / Civil Engineer
Quantity Surveyor · Building Lawyer
Town Planner · Land Surveyor
Building Inspector · WHS Consultant
建筑师 · 建筑设计师
结构/土木工程师
工料测量师 · 建筑律师
城市规划顾问 · 土地测量师
建筑检查员 · 安全顾问
✕ CSCOM does not assume✕ CSCOM明确不承担
Developer · Domestic Builder
Building Surveyor (permits)
Superintendent · Certifier
Site Manager / Supervisor
Development Manager
开发商 · 住宅Builder
建筑测量师(许可审批)
合同认证人 · 法定认证人
现场经理/主管
开发管理人
Role工种
Registration注册要求
Authority权限
CSCOM boundaryCSCOM边界
Owner's Representative
业主代表
No statutory licence通常无独立牌照
No statutory authority无法定权限
Communication support and owner-side coordination only. Does not create authority to issue directions, approvals or contractual instructions unless expressly authorised by the homeowner and recognised under the relevant contractual arrangements.仅限沟通支持和业主方协调。不代表业主发出指令、批准或合同指示,除非业主明确授权且相关合同安排予以认可。
Owner-side Project Coordination
业主方项目协调
No statutory licence无法定牌照
No statutory authority无法定权限
Coordinates information, records and communication on behalf of the homeowner. Does not manage construction works or direct contractors.代表业主协调信息、记录和沟通。不管理施工作业或指挥承包商。
Project Risk & Documentation Support
项目风险与文件支持
No statutory licence无法定牌照
No statutory authority无法定权限
Supports documentation, record organisation and risk observation. Does not provide building consulting or technical opinions.支持文件整理、记录管理和风险观察。不提供建筑咨询或技术意见。
Contract Administration Support
合同管理支持
No statutory licence无法定牌照
No statutory authority无法定权限
Supports document organisation, correspondence tracking and owner understanding. Does not perform contractual certification, formal contract administration or superintendent functions.支持文件整理、函件跟踪和帮助业主理解合同。不执行合同认证、正式合同管理或合同认证人职能。
Architect
建筑师
ARBV registered必须ARBV注册
May certify contractual matters where expressly appointed under the relevant contract在相关合同明确委任时,可认证合同事项
Coordinate registered architect协调注册建筑师交付
Building Designer
建筑设计师/绘图师
BPC registration (some)部分需要BPC注册
Depends on category权限取决于类别
Coordinate qualified designer协调合格设计人员交付
Structural / Civil Engineer
结构/土木工程师
Must be registered必须注册
Authority limited to engineering engagement权限仅限于工程委托范围
Coordinate registered engineer协调注册工程师交付
Quantity Surveyor
工料测量师
Registration exists维州存在注册类别
Authority depends on engagement scope权限取决于委托范围
Coordinate QS — key partner协调QS交付;关键合作角色
Building Lawyer
建筑律师
Practising certificate必须获准执业
Legal advice + notices可以提供法律意见
Coordinate practising lawyer协调执业律师交付
Building Inspector
建筑检查员
Must be registered必须注册
Statutory inspection results for Building Surveyor向Building Surveyor提供法定检查结果
Coordinate registered inspector协调注册专家交付
Independent Building Inspector
独立验房/缺陷检查
Varies by scope视工作范围而定
No statutory certification通常无法定认证权
Coordinate qualified inspector协调合格专家交付
Town Planner
城市规划顾问
No mandatory licence通常无强制执业牌照
Planning applications可提交规划申请
Coordinate planning consultant协调专业顾问交付
Land Surveyor
土地测量师
Must be registered必须注册
Statutory survey documents可签法定土地测量文件
Coordinate registered surveyor协调注册测量师交付
WHS / OHS Consultant
安全顾问
No unified licence未必有统一牌照
Cannot replace builder's OHS duty不能代替Builder安全责任
Coordinate; no site responsibility协调安全顾问;不承接现场责任
Developer
开发商
No unified licence通常无统一牌照
May act as owner, principal or project sponsor depending on project structure可根据项目结构作为业主、合同主体或项目发起人
Does not assume明确不承担
Development Manager
开发管理人
No statutory registration无独立法定注册
Per authorisation取决于授权
Not currently; future evaluation现阶段不承担;未来可评估
PM (Domestic)
注册住宅项目经理
BPC registered (VIC)维州需要BPC注册
Coordination, not statutory管理协调,非法定认证
Not currently; future direction现阶段不承担;未来升级方向
Domestic Builder
住宅Builder
Must be registered必须注册
Responsible within the scope of the building contract and applicable legislation在建筑合同和适用法律范围内承担责任
Does not assume明确不承担
Building Surveyor
建筑测量师
Must be registered必须注册
Permits + Occupancy Permit可签发建筑许可、入住许可
Does not assume不承担;由注册专家负责
Superintendent
合同认证人
No unified licence无统一牌照
Authority depends on contractual appointment权限取决于合同委任
Does not assume现阶段不承担
Site Manager / Supervisor
现场经理/主管
Under builder registration受注册Builder监督
Site records + management施工记录和现场管理
Does not assume明确不承担
Certifier
法定认证人
Registered (Building Surveyor etc.)对应Building Surveyor等注册人
Statutory certification有法定认证权
Does not assume明确不承担
APPROVAL, CERTIFICATION & DECISION AUTHORITY MAP审批、认证与决策权限地图

Approvals, certifications and decisions in a residential project carry very different legal weight depending on who acts, under what authority, and what responsibility it represents. Statutory approvals, professional opinions, contractual certifications and owner approvals must not be confused.住宅项目中的审批、认证和决策,其法律效果、专业责任和授权来源完全不同。不能把法定审批、专业意见、合同认证与业主商业批准混为一谈。

STATUTORY APPROVALS法定审批
Building Permit建筑许可Building Surveyor
Occupancy Permit入住许可Building Surveyor
Mandatory Inspection法定检查Inspector / Surveyor
PROFESSIONAL OPINIONS专业意见
Structural Certificate结构设计证书Registered Engineer注册结构工程师
QS Cost Report造价报告Quantity Surveyor
Legal Advice / Notice法律意见/法律文件Lawyer
CONTRACTUAL CERTIFICATIONS合同认证
Progress Certificate进度证书Superintendent / CA / QS
Practical Completion实质完工证书CA / Superintendent
Builder DeclarationBuilder申报Registered Builder注册Builder
OWNER APPROVAL业主批准
Owner Approval业主商业决定Owner / Authorised Rep业主/授权代表

This is where CSCOM helps — supporting the owner so that commercial decisions are informed, recorded and traceable.这正是CSCOM发挥作用的位置——帮助业主让商业决定有依据、有记录、可追溯。

This table is for general project governance illustration only and does not constitute legal, engineering, building surveying or statutory approval advice. Victoria-specific; other states may differ.本表仅作一般性项目治理说明,不构成法律、工程、建筑测量或法定审批意见。以维州为准,其他州可能有所不同。

Governance Principle治理原则

CSCOM's role is to improve the homeowner's access to organised information, documented project history and informed decision-making. CSCOM does not replace statutory authorities, licensed practitioners, contract-appointed decision makers or independent professional advisers.CSCOM的角色是帮助业主更好地获取有组织的信息、有记录的项目历史和知情的决策支持。CSCOM不取代法定主管部门、持牌从业人员、合同指定的决策者或独立专业顾问。

CSCOM does not issue engineering, architectural, surveying, quantity surveying or legal opinions. Professional opinions remain the responsibility of the appropriately qualified professional engaged for that purpose.CSCOM不出具工程、建筑设计、测量、工料测量或法律意见。专业意见仍由为此目的聘请的具备相应资质的专业人士负责。

Independent inspections arranged through CSCOM are separate from statutory inspections required under applicable building legislation.通过CSCOM安排的独立检查,与适用建筑法规要求的法定检查是分开的。

Before the project gets complicated,
build the owner's own record first.
在项目变得复杂之前,
先建立属于业主自己的记录。

The earlier you establish a project structure, the easier it is to keep contracts, payments, variations and professional advice continuous.越早建立项目结构,合同、付款、变更、沟通和专业意见就越容易保持连续。

V2.1 July 2026 trust.cscom.com.au/role-and-responsibility